Enhancing Fault Tolerance in Onshore and Offshore Wind Parks: The Role of Redundant SCADA and Power Plant Controller Systems
- russellhiston
- Jul 26, 2024
- 2 min read

As the global push towards renewable energy intensifies, the reliability and efficiency of wind parks—both onshore and offshore—become increasingly critical. One key aspect of ensuring this reliability is the implementation of redundant systems for Supervisory Control and Data Acquisition (SCADA) and Power Plant Controllers (PPC). This blog explores how redundancy can significantly improve fault tolerance, ensuring continuous operation and minimizing downtime.
The Importance of Redundancy
1. Continuous Operation During Updates: Redundant SCADA and PPC systems are particularly beneficial for large onshore wind parks and all offshore wind parks. With redundancy, one system can continue to operate while the other undergoes software updates, ensuring no downtime and maintaining optimal performance.
2. Avoiding Costly Shutdowns: Utilities may require control over your wind park, and in some cases, wind parks must shut down if there is no operational control system. This can lead to significant Liquidated Damages (LDs) that could quickly offset the cost of implementing a redundant system. Thus, redundancy isn't just about fault tolerance—it's a strategic investment to avoid costly interruptions.
3. Comprehensive Fault Tolerance: Fault tolerance is crucial across control, surveillance, and data management systems. Different Recovery Time Objectives (RTOs) for each component can help minimize downtime and streamline maintenance. By having redundant systems in separate fire zones, you can ensure that a fire in one zone doesn't incapacitate your entire operation.
Strategic Redundancy Implementation
1. Focus on Critical Systems: Redundancy might not be necessary for all systems. Prioritize critical systems—control, surveillance, and data management—where fault tolerance is most crucial. This targeted approach ensures maximum efficiency and cost-effectiveness.
2. Onshore Redundancy for Offshore Wind Parks: For offshore wind parks, it's advantageous to have both primary and secondary systems located onshore. This arrangement simplifies maintenance and allows for easier access to redundant systems, ensuring faster response times and reduced downtime.
3. Software Consistency and Hardware Redundancy: In most cases, redundancy does not extend beyond hardware. The redundant system typically runs the same software as the primary system. However, having a third watchdog system to monitor and determine which system is operational adds an extra layer of reliability.
Designing for Your Needs
Redundancy in SCADA and PPC systems is a complex topic that requires careful design tailored to your specific wind park requirements. It's essential to work with experts to develop a robust and efficient system.
For those looking to enhance the fault tolerance of their wind parks, expert guidance is invaluable. Reach out to rh@enexa.com.au for support in designing your wind park SCADA and Power Plant Controller system.
Conclusion
Implementing redundant SCADA and PPC systems is a strategic move that can significantly improve the fault tolerance of both onshore and offshore wind parks. By ensuring continuous operation during updates, avoiding costly shutdowns, and focusing on critical systems, you can enhance the reliability and efficiency of your renewable energy assets. Properly designed redundancy not only protects your investment but also contributes to the overall stability of the power grid.


Comments